Peaslake Barns

  This is what we do best – breathing new life into historic barns.  This pair dating from the 18th Century are being sensitively refurbished with modern materials.  The process involves taking the building back to its core…

2 New Modern Houses – Winchester

    Hickory have been appointed to construct two modern 3 bed semi detached houses in Winchester.   Working with Winchester based architect – Adam Knibb Architects – the houses are designed, and will be built,  with sustainability…

6 Flats – Whyteleafe

Hickory were appointed after a competitive tender process to build this block of 6 apartments.  The building consists of 4no. one bed and 2no. two bed, modern flats. The works include extensive external works on a sensitive tight urban plot.The building is finished using…

Three Houses – Cranleigh

Hickory Construction was appointed to split an existing property into a pair of semi’s and to build a new detached property in the grounds.  The project completed on budget with a high quality finish, with specific attention paid…

Private House nr Guildford

Hickory Was appointed to rebuild a burnt down house on the outskirts of Guildford.  The house, built in an Art Deco Style, was completed to the highest standards with large windows and oversized internal doors.  Renewable heating is…

Two Houses – Chessington

  Development of a pair of 3 bedroomed detached houses.   Key Features: Sharp rendered finish Slate roof PVs on roof

Three Houses – Liphook

    Hickory were appointed to construct this row of three detached houses for a developer client.  Operating on a fixed price contract the properties were build over a 7 month programme.    Key Features: Three detached properties…

Kingswood Home

  Hickory won this contract on a negotiated basis for a developer client with whom we enjoy a good working relationship.  The property was constructed over a 6 month period and consists of 5 bedrooms, fitted open plan…

Bramley Barns

  Hickory Construction was appointed to complete a comprehensive redevelopment of an existing unoccupied barn.  The property was sensitively  divided into a terrace of 5 separate houses over the course of a 12 month period.  Key features: Fixed price contract…